代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Unit_002_Risk_Assessments

2013-11-13 来源: 类别: 更多范文

Task Av Risk assessments should be carried out before an activity to identify and minimize potential hazards before occurring. The risk assessment for a water play activity should include the risks, the identified potential hazards, who are actually at risk, the level of risk after evaluation and the appropriate action to be taken to minimize the risk or hazard. The risk assessment that was carried out for the outdoor activity I have called ‘puddle play’, was for children between the age of 3 and 4 years. However this risk assessment will change according to the children’s age, developmental level and abilities. For example the suitable depth of water in the puddles would be different for a baby of 9 months old to a child of 4 years. This is because there is an increasing chance of the younger child drowning than the older child because the older child has a higher sense of danger. The risk assessment that was carried out for the indoor water activity was for children between the ages of 2 and 3. This activity consisted of bubbles and small aquatic animal toys. Again, the depth of the water would need to be considered and altered because these children are younger and more vulnerable to the risk of drowning. The level of supervision would also change taking into consideration the staffing ratios. Adult to child ratios |Age |Adult: child | |0-1 years |1:3 | | | | |1-2 years |1:3 | |2-3 years |1:4 | |3-4 years |1:8 |
上一篇:Unit_5-Principles_of_Safeguard 下一篇:To_the_Moon