代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Site_Inverstigation_Bullet_Points

2013-11-13 来源: 类别: 更多范文

SiTE INVESTIGATION NOTES – CONTENTS The notes formed a chapter in a book about tunnels and thus comments and examples relate more to tunnels than to other forms of construction but can be applied to these. Highlighted in red are those sections that relate directly to the lectures given and these provide more background and detail to the powerpoint slides. The aim here is to provide background information not readily available in books and full references should anyone wish to look up elements in greater detail. Section | Sub-heading | Title | Page | 1.0 | | Introduction | 1 | | 1.1 | Aims and Structures of Site Investigation | 1 | | 1.2 | Ground Hazards | 3 | | 1.2.1 | New Construction: Tunnels example | 5 | | 1.2.2 | New Construction: Cut and Cover Example | 8 | | 1.3 | Managing the Risk | 8 | 2.0 | | Preliminary Sources Survey (the Desk Study) | 9 | | 2.1 | Introduction | 9 | | 2.2 | Sources of Information | 11 | | 2.3 | Site Inspection Survey | 12 | | 2.4 | Preliminary Sources Survey Report | 13 | 3.0 | | Main Ground Investigation | 14 | | 3.1 | Planning the Exploration: Borehole/Pit/Probe Location and Depth | 14 | | 3.2 | Methods of Exploration | 16 | | 3.2.1 | Boreholes | 16 | | 3.2.2 | Trial Pits and Probes | 21 | | 3.3 | Geophysical Explorations | 22 | | 3.3.1 | Background | 22 | | 3.3.2 | Planning a Geophysical Survey | 26 | | 3.4 | Sampling and Quality | 27 | | 3.4.1 | Purpose and Type of Sampler | 27 | | 3.4.2 | Sample Quality and Disturbance | 27 | | 3.4.3 | Representative Samples | 31 | | 3.4.4 | Sampling and Engineering Practice | 32 | 3.5 | | In-situ Testing | 33 | | 3.5.1 | Standard Penetration test | 33 | | 3.5.2 | Permeability Testing | 34 | | 3.5.2.1 | Raising or Falling Head tests | | | 3.5.2.2 | Constant Head Tests | | | 3.5.2.3 | Packer Tests | | | 3.5.3 | Static Probing, Cone Penetration test (CPT) | 35 | | 3.5.4 | Dynamic Probing | 35 | 3.6 | | Groundwater | 36 | | 3.6.1 | Groundwater Observations in Boreholes | 36 | | 3.6.2 | Piezometers | 37 | | 3.6.3 | Standpipes | 37 | | 3.6.4 | Standpipe Piezometers | 38 | 3.7 | | Laboratory Testing | 38 | | 3.7.1 | Classification and Index Tests | 39 | | 3.7.1.1 | Plastic and Liquid Limits | 39 | | 3.7.1.2 | Particle Size Distribution | 39 | | 3.7.2 | Geotechnical Parameter Tests | 40 | | 3.7.2.1 | Strength Tests | 40 | | 3.7.2.2 | Undrained Tests | 40 | | 3.7.2.3 | Effective Stress Tests | 41 | | 3.7.2.4 | Oedometer Tests | 42 | | 3.7.2.5 | Permeability Tests | 42 | | 3.7.2.6 | Soil Chemical Tests | 42 | 4.0 | | Construction Investigations: Records and Feedback | 43 | 5.0 | | Geotechnical Reports | 43 | 6.0 | | References | 47-50 |
上一篇:Soc120_Week2_Assignment 下一篇:Scientific_Method_Matrix