代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Poor_Leadership

2013-11-13 来源: 类别: 更多范文

I was appointed as an Mechanical and Electrical Manager to several upgrading and renovation works. The M&E works were the air conditioning and mechanical ventilation (ACMV), electrical distribution, uninterruptible power system and generator. We engaged external Mechanical and Electrical Consultants to design and draft the specifications. All works were tendered out and awarded to the lowest tenderers that comprised to the design and specifications. I was assisted by an Engineer and a Technical Officer in the coordination, testing and commissioning of all the M&E system. During the last December School holiday, I approved both their annual leaves, about two weeks. I pull in my maintenance team, a Senior Technical Officer to cover the project works. My Senior Technical Officer recommended a variation order to modify the electrical protection system that was necessary to prevent a nuisance tripping due to surging of current. The recommendation was supported as it makes logical sense. About a month later, the contractor hand over the renovated premise. Testing and commissioning were carried out and no sign of defect was noted. The entire Mechanical and Electrical system went live the following week. My Engineer, Technical Officer and myself attended the opening ceremony. Half way through the ceremony, we experienced power tripping in some equipment. We investigated and it was caused trigger by a spill drink on an equipment. However, the tripping caused more than ten percent of the equipment to trip, which was abnormal. My team immediate ran thru the entire electrical protection system. We discovered, there an over design of protection system that was approved by me a month ago. We immediately bypass the protection system and were able to supply power back to the equipment. The tripping was a bad experience it was an official opening ceremony where all the bosses attended. What cause the over design was due to change of design was not informed
上一篇:Professional_Knowledge_and_Abi 下一篇:Polic_Process_Part_I