代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

New_York

2013-11-13 来源: 类别: 更多范文

Manhattan, New York. Ground Zero memorial project. Everyone knows where they were or what they were doing 11 years ago on the unfortunate day. There were many project managers in the process of rebuilding ground zero. Phase 1 Project conception and initiation The memorial design team heads were Michael Arad and Peter Walker. These two groups had to come together and bring in an idea that can be realistically completed. “Based on Arad's entry to the 2003 international competition that drew 5,201 submissions, it forms an 8-acre plaza comprising outdoor rooms shaped by granite, bronze, water, and trees. Arad called his entry “Reflecting Absence” because it preserves the footprints of the Twin Towers as square holes where water cascades into pools that reflect the Lower Manhattan skyline.” Phase 2 Project definition and planning Drawings were created to give an idea what the area was to look like once completed. Even though a committee had approved the project the lead designers continued to change the plans as they went forward. However at this time it was estimated that the cost was going to be roughly 490 million dollars. The plan was scheduled to be complete September 11, 2010. Phase 3 Project launch or execution Many teams were constructed from those who were replanting of the trees to constructing the two waterfalls in both locations. Even re designing the roads so that the area is more efficient to drivers. With the towers the way they stood before, down town Manhattan was blocked off and a team of designers were able to open it up and make it so that people could pass through down town easier. National September 11 Memorial at the World Trade Center Design Architect: Handel Architects — Michael Arad and Gary Handel, partners; Amanda Sachs, David Margolis, Robert Jamieson, Cristóbal Canas, and Garrett Brignoli, project team Architect of Record: Davis Brody Bond Aedas — Steven Davis, Carl Krebs, David Williams, Joseph Grant, Richard Franklin, project team Landscape Architect: PWP Landscape Architecture — Peter Walker, Douglas Findlay, David Walker, Matthew Donham, project team National September 11 Memorial Museum Entry Pavilion Architect: Snøhetta — Craig Dykers, partner in charge; Anne Lewison, project manager; Aaron Dorf, project architect Architect of Record: Adamson Associates International Phase 4 Project performance and control Projects can be held up on an account of not having materials on time and things not being ready so therefore project managers will have to readjust the situation to make sure that they meet dead lines to accommodate what is expected of them by the time of the reopening. Phase 5 Project close Ground zero was inspected by the city and approved the work. The grand memorial opening was done September 11, 2010. With the approval of the president of the United States. I do understand that this project was completed last year but this was a project that meant a lot to me. I was there that day and rebuilding was something I always wanted. I’m glad that it is there now. I was unable to attend last years ceremony however this year I do have plans to travel to New York for the grand opening of the museum and also at that time I will be paying my respects once again to those who died on that unfortunate day. Reference: National September 11 Memorial & Museum http://archrecord.construction.com/projects/portfolio/2011/09/National-Sept-11-Memorial-Museum.asp
上一篇:Night_Talkers 下一篇:Musumeci_Capital_Management