服务承诺
资金托管
原创保证
实力保障
24小时客服
使命必达
51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展
积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈Managing_Safely_V3._Project_Answers_School
2013-11-13 来源: 类别: 更多范文
Managing safely v3.1 – project
Introduction
As part of the Managing safely course, you have to complete a project and have it assessed. You will be expected to carry out a risk assessment based on your own work environment. You need to record the results on the attached sheets and submit them for marking. Do not submit any additional material in support of your project work as only the six parts of the A4 project will be assessed. The project can be word processed or hand written.
When you have completed your work you should return it to
There is a two week time limit for the return of the project. Your project must be completed and returned by
Instructions
Please read all of the instructions before starting work on your project.
The project is broken down into a number of parts. Please complete each section as detailed below.
Part 1 – description of the work tasks that are your responsibility
Record a brief description of all the work tasks within your work environment including:
• description/labelled sketch of the location(s)
• people who work in or visit the area on a regular basis or from time to time. (Think about the different groups of people who may be in the area and how often they may be there.)
• permanent and temporary items of equipment and substances
• activities carried out within your work environment
Part 2 – a hazard checklist of the location(s)
Record a brief description of three location hazards that may arise in your work environment. For example, car park, stairs, uneven floor. For each of these hazards please include:
• a description of the location
• a description of the hazard – in relation to the location
• the number and occupation of people who could be affected by the hazard – in relation to the location
• whether a risk assessment is recommended
Part 3 – a hazard checklist of permanent and/or temporary items of equipment and substances used in your work environment
Record a brief description of three hazards that may arise from equipment or substances used. For each of these hazards please include:
• a description of permanent and/or temporary items of equipment and substances used
• a description of the hazard – in relation to the equipment/substance
• the number and occupation of people who could be affected by the hazard - in relation to the equipment/substance
• whether a risk assessment is recommended
Part 4 – a hazard checklist of the activities carried out within your work environment
Record a brief description of three hazards that may arise from within your work environment. For each of these hazards please include:
• a description of the work activity
• a description of the hazard – in relation to the work activity
• the number and occupation of people who could be affected by the hazard – in relation to the work activity
Note: for the purpose of this exercise all three activity hazards that you are assessing on part 4 must require a risk assessment.
Part 5 – carrying out a risk assessment
Please carry out a risk assessment on all three of the activity hazards you have listed on part 4. Please make sure you include:
• a description of the work activity
• a description of the hazard, hazardous event and expected consequence – in relation to the work activity
• the number and occupation of people affected – in relation to the work activity
• an assessment of risk (please use the 5 x 5 matrix) – in relation to the work activity
Note: for the purpose of this exercise all three activity hazards that you are assessing on part 5 must require risk controls.
Part 6 – risk control recommendations
Please complete the risk control form for all three activity hazards you have listed on part 5. Please make sure you include:
• a description of the work activity and risk level from the risk assessment
• existing risk controls
• any further risk controls required - in relation to the work activity
• the residual risk (please use the 5 x 5 matrix) - in relation to the work activity
• a description of the type of monitoring required and how often - in relation to the residual risk
Note: where you have large numbers of hazards in your work environment you will not have space to record them all. In these circumstances, select a representative sample of hazards for the purposes of this project and record only these. Remember that only three hazards are required for parts 2, 3, and 4.
Each part has a maximum number of marks which can be awarded and details are given in the table below.
|Part |Maximum marks |
|1 |18 |
|2 |16 |
|3 |16 |
|4 |13 |
|5 |30 |
|6 |30 |
|Total |123 |
|Minimum mark |62 |
Finally, before returning your project check that your name, the end of course date, the name of your company, the site name and the name of your training provider are recorded on the first sheet.
Please also ensure that you sign each sheet to confirm that the work you submit is your own.
Please note: the small square boxes in the bottom right hand corner of each section on parts 2 to 6 are for the markers use only.
| |
|Marks |
|allocated |
| |
| |
| |
| |
| |
| |
| |
Part 1 – description of the work tasks that are your
responsibility (continued on the next page)
Delegate name……………………………… End of course date………………………....
Company……………………………………. Site name…………………………………....
Training provider……………………………………………………………………………......
|A description/labelled sketch of the location(s) |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|A description of the people who work in or visit the area on a regular basis or from time to time and how often they’re there |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|Marks |
|allocated |
| |
| |
| |
| |
| |
| |
Part 1 – description of the work tasks that are your
responsibility
|A description of permanent and temporary pieces of equipment and substances used in your work environment |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
|A description of the activities carried out within your work environment |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
-----------------------
[pic]
[pic]
[pic]
The location(s) you manage
No
Yes
No
Yes
No
Yes
Risk assessment recommended' (If no, please explain)
Number and occupation of people affected
(in relation to the location)
Description of the hazard
(in relation to the location)
Description of the
location
[pic]
Site name:
Department:
Company:
Hazard Checklist: locations(s)
Part 2
Permanent and temporary pieces of equipment and substances used in the work environment
No
Yes
No
Yes
No
Yes
Risk assessment recommended' (If no, please explain)
Number and occupation of people affected
(in relation to the equipment/substance)
Description of the hazard
(in relation to the equipment/substance)
Description of the
equipment/substances
[pic]
Site name:
Department:
Company:
Hazard Checklist: equipment and substances
Part 3
Note: For the purpose of this exercise, all three activity hazards must require a risk assessment.
Activities carried out within your work environment
No
Yes
No
Yes
No
Yes
Risk assessment recommended'
Number and occupation of people affected
(in relation to the work activity)
Description of the hazard
(in relation to the work activity)
Description of the
Work activity
[pic]
Site name:
Department:
Company:
Hazard Checklist: activities
Part 4
Number:
Occupation:
Number:
Occupation:
Number:
Occupation:
=
X
No
Yes
No
Yes
No
Yes
(in relation to the work activity)
(in relation to the work activity)
Signature:
Position:
Assessor’s name:
Date of next review:
Review period:
Time:
Date:
Note: For the purpose of this exercise, all three activity hazards must require risk controls.
Are risk controls required'
Risk
level
Consequence level
Likelihood level
Assessment of risk
People affected
(in relation to the work activity)
Hazard, hazardous event and expected consequence
(in relation to the work activity)
Work activity
[pic]
Site name:
Department:
Company:
Risk assessment form
Part 5
=
Frequency:
Frequency:
Signature:
Position:
Assessor’s name:
Date of next review:
Review period:
Date:
Frequency:
Description of
monitoring required
(in relation to the residual risk)
X
New risk
level
Potential
Consequence
Probable
Likelihood
Residual risk
Further risk
controls required
(in relation to the work activity)
Existing
risk controls
(in relation to the work activity)
Work activity and risk level (from risk assessment form)
[pic]
Site name:
Department:
Company:
Risk control form
Part 6
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
Please sign to confirm that this is your own work:__________________
√
√
√
√
√
√
Lynwood
FAO Lee Johnston
Suite 2b
The Old Courthouse
Chapel Street
Dukinfield
SK16 4DT
Risk level:
Risk level:
Risk level:

