代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Flowchart_Process

2013-11-13 来源: 类别: 更多范文

Introduction I have selected the process of filling the water in bath tub as illustration of flow chart. I have used the features of Microsoft Word to design the flowchart. Flowcharts are valuable than fancy graphics as it represents the systematic flow of logic to all the involved members in effective manner. Comment on the factors that affect the process design The factors that affect the process of design in filling the bath tub are right temperature and adequate water in the tub. It acts as decisive factor is execution of steps. Following are the steps involved in filling the bath tub: (1) set the knob for hot and cold water. (2) If temperature of water is too hot or too cold, then go to step 3, else go to step 4. (3) Increase the temperature of hot or cold water to get reasonable warm water and go back to step 2. (4) Wait for two minutes or less as required amount of waiting time for filling the tub. (5) If bath tub is full, then go to step 7, else go back to step 6. (6) Go back to step 4. (7) Close the tap of hot and cold water. Start and end steps are represented as oval shapes. I have used the parallelogram for processing steps of 1, 3, 4 and 7. Decision steps involved in 2 and 5 are shown by diamond shape. Arrow symbol is used for showing the flow of process. One metric that you will use to measure the process and why those metrics are valuable I will use the time as metric because they are critical in filling the tub respectively. Conclusion Flowchart can also be referred again and again to understand the system as documentation allows keeping the blueprint of design for analysis in the development of system. For the next couple weeks will collect data to see if the data collated for time has change since the first week. Have included the flowchart and also the data collected for the first week assignment. Flow Chart Data Collected WEEK 1 Waiting Time for Filling Bath Tub (Seconds) Tuesday 105 Wednesday 115 Thursday 95 Friday 108 Monday 114 References Chase, R., Jacobs, R., Aquilano, N. (2005). Operations Management for Competitive Advantage. 11th Ed. McGraw-Hill/Irwin.
上一篇:Frankenstein_Blade_Runner 下一篇:Film_Analysis