代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Flow_Chart

2013-11-13 来源: 类别: 更多范文

Bottlenecks in a Process Grozdanka Andonova University of Phoenix OPS/571 November 2010 Diane Rector [pic] One of the processes that I performed daily is preparing lunch for my boy in the morning. Usually I spend 20 min for that process. The process has 4 stages that are relatively independent, except 1st and 2nd stages, but cannot be performed simultaneously. The stage 1 sliced bun and add meat, cheese, and vegetables and stage 2 wrap the sandwich are consecutive. After that the ready sandwich has to stay in buffering for the time of the 3rd stage – cut and zip the fruits - is running on. The wrapped sandwich, zipped fruits, and packed items moved to the 4th stage bag the lunch. The running time is a process measure. Analyzing the process shows that 3rd stage is a process bottleneck “the activity in a process that limits the overall capacity of the process” (Chase, Jacobs, and Aquilano, (2006), p. 166). The process was under 10 days monitoring period. During that period, different tests to shorten the run time and eliminate the bottleneck of the process were conducted. One of the possible ways to abolish the buffering is to cut and wrap the fruits from the previous night and add them in the morning as packed items. 7 minutes 3 minutes 6 minutes Preparing the fruits previous night defiantly impacts on the process. For example, by eliminating the stage 3, the buffering time in the process was eliminated and the whole run process become short with 4 minutes that is the time for completing the 3rd stage. The running time for the process in this way is 16 minute. Another impact concerns the quality of the products. Unfortunately, the quality of the fruits becomes worse and inappropriate. Because the quality of the lunch is the most important measure, the process cannot be shortened in this way. The shortening of process’s length is an important factor for achieving greater efficiency. However, when making decisions to shorten a process’s length, other factors—especially the quality of the final product—must be taken into consideration. References Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2006) Operations management for competitive advantage (11th ed). New York: McGraw Hill/Irwin. ----------------------- Raw materials Slice bun, add meat, cheese and vegetables Wrap the sandwich Packed products and zipped fruits Bag the lunch
上一篇:Frankenstein_Blade_Runner 下一篇:Film_Analysis