代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Drive_to_Work_Process

2013-11-13 来源: 类别: 更多范文

Running head: DRIVE TO WORK PROCESS Drive to Work Process University of Phoenix Introduction I have selected the process of preparation and driving to work on daily. I have tried to use the process as illustration of flow chart. I have used the features of Microsoft Visio to design the flowchart. Flowcharts are valuable than fancy graphics as it represents the systematic flow of logic. The Flowcharts also represent the complete logic in a very pictorial representation which is easy to understand by everyone. Comment on the factors that affect the process design The factors that affect the process of design in prepare and drives to work are morning wake up alarm and traffic conditions on the freeway. It acts as decisive factor is execution of steps. Following are the steps involved in preparation and drive to work: (1) Prepare the gym and cloth kit in the night (2) Check the weather condition If weather condition are rainy then go to step 3, else go to step4 (3) set the morning wake alarm for 5:20 am. (4) set the morning wake alarm for 5:30 am. (5) Get up and get ready in morning and start the car for work (6) Check the meter light before merging on freeway. (7) If meter light is green, then go to step 7, else go back to step 8. (8) Merge on freeway. (9) Check the traffic on freeway. If freeway traffic is not crowded then go to step 11 else step 12 (11) Drive the car at faster with the maximum allowed speed limit (12) Drive the car at slower with low speed (13) Park the car and go to office Start and end steps are represented as oval shapes. I have used the parallelogram for processing steps of 1, 3, 4, 5, 6, 8, 11, 12 and 13. Decision steps involved in 2, 7 and 9 are shown by diamond shape. Arrow symbol is used for showing the flow of process. One metric that you will use to measure the process and why those metrics are valuable I will use the time as metric because they are critical to capture the time travel to work on a daily basis. Conclusion Flowchart can also be referred again and again to understand the system as documentation allows keeping the blueprint of design for analysis in the development of system. For the next couple weeks will collect data to see if the data collated for time has change since the first week. Have included the flowchart and also the data collected for the first week assignment. Flow Chart [pic] Data Collected |WEEK 1 |Get up and get ready in morning |Wait time at meter light |Time took on the freeway | | |(Minutes) |(Minutes) |(Minutes) | |Tuesday |25 |2 |79 | |Wednesday |20 |0 |40 | |Thursday |22 |3 |45 | |Friday |30 |2 |35 | |Monday |20 |2 |40 | References Chase, R., Jacobs, R., Aquilano, N. (2005). Operations Management for Competitive Advantage. 11th Ed. McGraw-Hill/Irwin.
上一篇:Dtlls_Unit_3 下一篇:Dimensions_of_Culture,_Values,