代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

Computer_Network

2013-11-13 来源: 类别: 更多范文

Campus WAN Network Project Project Overview The University (UCM) network infrastructure was completed in …. The GIS department were connected to the ICT centre using fibre optic technology as backbone. GIS network is connected to Human resourse and BR staff offices using fiber optic but BR staff offices fiber is not currently working. BR staff offices are currently connected to Human Resourses using cat 5e UTP cable. 1 Wireless access point hotspots were installed in some of these buildings. The WAN (Wide Area Network) link was also upgraded from a leased line setup to VSAT (Very Small Aperture Terminal). Two new servers were acquired and configured as the Web Server, Mail Server and Accounting application Server. The Network Project will comprise of the following: 1). Extend and re-route the network the following departments: 1 Health Centre, Medical Research Centre 2 clinic, In addition there will be a Community WiFi to provide wireless access to the campuses and areas around them. The ICT department will be connected to Health Centre using a radio link. In addition, wireless access points will be provided in the following departments: Library, Economics, IT, FHS, Rectory , Medical research and medical Centre 2). Manage and optimize the current bandwidth by implementing VLANs, installing bandwith management and monitor shaper and installing and implementing Cisco LAN Management Solution . 3). Replace all hubs and unmanageable switches. 4). Two smart classrooms equipped with audio visual equipment and electronic whiteboards were also created. Distance Education and Dept of IT Have 2950 with two single mode fibre which will installed as backbone switch to Dept of Economics. Needs 4 48ports cisco 2960 switches without fibre Cable management on all cabinets Dept of Economics Have 2950 with two single mode fibre which will installed as backbone switch from Distance Education and Dept of IT to Main Campus . Needs 2 x 48 ports cisco 2960 switches without fiber Cable management on all cabinets Intergration of systems Centralization of all system to be housed in the ICT department Primavera Accounting system Moodel e-learning online Koha library management Antivirus software File server, Windows SUS Medical Research centre Connected to internet using Vsat Needs 2 x 48 ports cisco 2960 switches without fiber Cable management on all cabinets Connect to the main backbone using utp cat6e Implementation Schedule The time line for the project is based on the attached project schedule. All efforts must be made to get the project completed before the start of the 2008 Fall Semester. As stated on the project schedule, some ICT staff members and works and grounds staff members will work side-by-side with the contractor to get the project completed on schedule.
上一篇:Contract_Creation_and_Manageme 下一篇:Compare_and_Contrast_of_China_