服务承诺
资金托管
原创保证
实力保障
24小时客服
使命必达
51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展
积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈Bottlenecks_in_the_Process
2013-11-13 来源: 类别: 更多范文
Bottlenecks in a Process
In this past week, I collected some data in relates to my current process for preparing to go to work. In this process, I was able to determine bottlenecks in my current process. Bottleneck is defined by Chase, Aquilano & Jacobs (2006) as any resource whose capacity is less than the demand placed upon it.
There were several bottlenecks in my current process that I was able to identify. I was also able to apply the Goldratt’s theory of constraints. The first step in Goldratt’s theory of constraints is to identify the system of constraint and decide how to exploit the constraints to more effective (Chase, Aquilano, & Jacobs, 2006). To improve a process and increase efficiency, bottlenecks in the process must be identified.
One of the bottlenecks that I was able to identify from the data collected was in the very beginning of my current process. It is when the alarm goes off, do I get up or do I hit the snooze button of the alarm clock and sleep in' I found that out of the five days timeframe in which I collected data, I average an additional 20 minutes in the process because I hit the snooze button in the alarm clock several times before I got up. To lessen the time of getting ready for work, I found that I should get up right away as soon as the alarm clock goes off and not allow myself to hit the snooze button of the alarm clock several times.
Additionally, I should always select and prepare my work clothes the night before to be more efficient in my preparation for work in the morning. I found this to be a bottleneck in my current process as well. Three out the of five days, I did not have clothes selected and prepared for work, I added an additional seven minutes in average in my current process for preparing for work. The third bottleneck in my process, but not necessarily adds time to the entire process is my breakfast preparation. There were two days in my week of collecting data, where I did not grab breakfast and it is due to my lack of hunger at that time. Skipping this process actually help my time to be less for preparing for work.
In summary, identifying the bottlenecks in my process helped me determine in what areas I need to focus further to be as efficient as possible in getting ready for work. The two bottleneck areas can be improved if I make different choices when I hear the alarm clock in the morning as well as choosing my attire for work the night before.

