代写范文

留学资讯

写作技巧

论文代写专题

服务承诺

资金托管
原创保证
实力保障
24小时客服
使命必达

51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。

51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标

私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展

积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈

机场建设考虑海洋地质的原因--Paper代写范文

2017-02-01 来源: 51Due教员组 类别: Paper范文

Paper代写范文:“机场建设考虑海洋地质的原因”,这篇论文主要描述的是机场建设中的海洋地质因素和地基处理方法,介绍了为什么需要考虑海洋地质因素的原因,并对谢佩岛机场附近的海域作出了图表分析;由于我们的机场建议从周围的保护和具特殊科学价值的地区,靠近市区的限制,海上大面积的填海也将需要机场,因此重要的是要了解地质河口地板。

Due to restrictions on our airport proposal from surrounding protected and SSSI areas, and the proximity to urban areas, a large area of offshore reclamation will also be required for the airport, and as such it is important to understand the geology of the estuary floor.

The low resolution image above, from the Onegeology webmap, shows the seabed sediments near Isle of Sheppey. Prior to the reclamation land construction, a comprehensive analysis is required in order to model and assess the behaviour of the platform during and after the construction period, as well as to calculate the volume both for soft sedimentation dredged from the site and the filled material. In order to create a framework that indicates the spatial distribution of geological formation in each of the reclamation sites, the following critical data and information is required: (27)

the distribution of the soft compressible sediment
base levels for dredging soft sedimentation from platform site
identification of drainage pathways under the reclamation
identification of areas that need ground treatment and chose the suitable method such as surcharge and dynamic compaction

The most widely used method in geological assessment is to use High Resolution Seismics – this is the most economical method for studying the first 100 meters of soil beneath the seafloor. It can determine the sedimentation structure by using devices such as sediment sounders, boomers and sparkers. (28) The offshore data from the webGIS of BGS (British Geological Survey) shows that the Quaternary deposit which forms the top of the seabed has a thickness of less than 50m in South and Southeast of England; therefore the High Resolution Seismics method can be successfully applied.

The approach adopted in building Chek Lap Kok airport provides guidance which could be followed when carrying out a more detailed investigation for the area of reclaimed land. The extensive site investigation undertaken there employed a ‘boomer acoustic source’, operating to depths of 100m, apart from the area where there is a small network of channels, which would cause acoustic turbidity on seismic records. To calibrate and confirm the lithological and geological data provide by the seismic interpretation, a suite of 3202 dredge-level CPTs were carried out combined with extensive borehole sampling. Once the sediment structure was identified, the superficial stiff mud layer, averaging 7.5m in thickness, could be dredged and used for the land reclamation.

Ground treatment methods

During the construction, an excavation of 15 to 20m depth will be required in order to provide space for sub-ground levels of the major Terminal buildings. Other buildings will also require some level of excavtion, so it becomes necessary to know the influence of the swelling on the behaviour of soil beneath. Much research has been carried out on London clay, and the research which carried out during the planning of Heathrow Terminal 5 provides us the evidence that no negative effect will be cause by excavation up to 25min depth onshore. (29)

In order to minimize the total and differential settlement of structure, ground improvement is required. For construction of large scale structures such as airport terminal buildings, ground treatments are often required prior to the construction of runways and the foundation of terminal facilities. For reclaimed land on sea, ‘drainage’ methods can be used to accelerate the rate of consolidation of soft mud; or dredge and fill methods, as with Chek Lap Kok, can also be supplemented with dynamic compaction. For us to select the appropriate treatment methods, the potential problems first need to be identified. The effectiveness of different ground treatment methods have been summarized by Watts and Charles in 1997. (29) For preloading, a relative large area is needed for the process to be practical and the costs can be high. The dynamical compaction is effective although it causes most compression in top 5-6 only and reduces much of the immediate settlement but not the long-term settlement. However, the cost for dynamic compaction has been compared with other form of ground improvement (preloading, jet grouting, vibrated concrete columns, etc.) and this showed dynamic compaction to be significantly cheaper than other forms of site improvement. (30)

On land, we suggest using dynamic compactions method, unless the detailed geological analysis shows the ground improvement must be attained at depth greater than 9m, for which we will use the combination of dynamic compaction with other systems such as a combination of wick drains and surcharge plus dynamic compaction.  The potential methods of ground treatment used in reclamation will be pumping, surcharge, vibro-compaction and dynamic compaction.

51due留学教育原创版权郑重声明:原创留学生作业代写范文源自编辑创作,未经官方许可,网站谢绝转载。对于侵权行为,未经同意的情况下,51Due有权追究法律责任。

51due为留学生提供最好的processing代写服务,亲们可以进入主页了解和获取更多paper代写范文 提供最专业的美国作业代写,详情可以咨询我们的客服QQ:800020041哟。-xz

上一篇:Bible is Pro-Choice --美国Paper代 下一篇:土壤侵蚀防治途径研究报告--Paper代写范文