服务承诺
资金托管
原创保证
实力保障
24小时客服
使命必达
51Due提供Essay,Paper,Report,Assignment等学科作业的代写与辅导,同时涵盖Personal Statement,转学申请等留学文书代写。
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标
51Due将让你达成学业目标私人订制你的未来职场 世界名企,高端行业岗位等 在新的起点上实现更高水平的发展
积累工作经验
多元化文化交流
专业实操技能
建立人际资源圈Airport_Extension_Project
2013-11-13 来源: 类别: 更多范文
Airport Extension Project
The airport runway extension took place on a large international airport that was in need of a mile long runway to accommodate the newer bigger jumbo jets to be produced in the near future. In order to fulfill this requirement, their largest runway needed to be extended 1000 feet. However, the budget and time restraints required that the project begin on February 1, 1999, be finished in 18 months, and cost less that 8 million dollars.
This airport had one major problem. The longest runway could only be extended over a large ravine that housed a four lane interstate highway and three sets of operating railroad tracks. This dilemma greatly increased the time and cost of the project; however, with the use of detailed scheduling and estimating, the project was made to easily fall within the time and cost requirements. BJG&C Construction Management began the planing by estimating the three major parts of the project: highway tunnel, railroad tunnel and runway extension. Using the 1996 Means estimating manual, labor costs, material costs and time estimates could be accurately calculated for each of the 61 tasks to be completed. After all of the estimates were completed the actual scheduling began. The
project, time, runway, cost, began, weeks, tasks, construction, completed, airport, tunnel, railroad, however, highway, estimating, dollars, back, within, three, smoothly, scheduling, schedule, required, pushed, planing, path, order, one, million, management, major, lid, large, increased, immediately, february, extension, extended, everything, estimates, costs, both, bjgc, 1999, work, using, until, under, tracks, took, through

